The Big Bore Seal Stem is ran with the Diamond Well Control Tool. This BBSS will improve more fluid with less back pressure (choke) effect on electrical submergible pump with an I.D. of 1.375 if needed to pass through to log 1” logging tools are able to go through. BBBS is set and pulled with 2″ GS tool.
Can also run multiple different sizes to control different zones for production and injecting fluids.